CoasterDynamix Comet - Construction Log Video@YouTube



2 layers of grass have been applied to the base.








Track completed and Lift Guide added.

Horizontal bracing added to vertical frame pieces & Walkway added.



Handrails & Station Floor added.



The animated neon sign is an optional extra.

Back to Faller Home Page